Yes, at long last, the tub has been installed! The toilet, too. The sink is on the floor, ready to be mounted on the wall atop its pretty legs. Hopefully, all plumbing will be finished tomorrow. I think there needs to be some sort of inspection by the Building Inspector before it's all kosher, but....we have a tub, and a toilet!
After the Solstice
12 hours ago
1 comment:
Toilets are very important! Hope all goes well with the plumber.
Post a Comment