Wednesday, February 18, 2009

One inspection away from finished.

Things are winding down, and today we had our plumbing, gas, ventilation, and general building inspections officially signed off. The dishwasher has been installed, the under-valance light fixture is back up and, at last, the long-awaited sink trim is finished!

I love, love, love the sink cabinet! The turned legs give it just the look that I had in mind. One little curtain and the country kitchen will be complete. Finding just the right little curtain, well...that might take some looking.





Except for the absence of a fridge, we have a kitchen once again.

I ran the dishwasher through a complete cycle, just to test it out. Afterward, I remembered that it still had the protective plastic film on the door, so I peeled that off and watched it shine!



In the bathroom, I turned on the tub faucet for the first time, let the shower run, and plugged and unplugged the drain with the little rubber drain plug on a chain. Fun, fun! I couldn't help but think of my nieces and how I'm sure they will want to try out the tub next time they visit. What could be better than a bubble bath in a big ol' tub, with bubbles up to your chin?!



The electrical inspection should take place in the next day or two, and then....back to The Cottage!

Tuesday, January 20, 2009

Inauguration Day, a new kitchen sink, and the bathroom tile is nearly complete!

On this Inauguration Day, hope and positivity prevail! What an exciting time for our nation!
On the home front, the remodel is going smoothly, and the pace seems to have picked up, maybe because the structural work is now done, and the decorative, creative part- the best part- is the main focus now.
Andrew and I spent some time at The Cottage last weekend, cleaning up and putting one more coat of Friendly Yellow on the kitchen walls before the countertops were installed.

We decided to make an upgrade to one of our new cabinets. One of the lower cabinets contains pull-out shelves. When we ordered our cabinets, we went with the basic stock shelves, which have flexible white plastic rails around the edges, to keep objects from falling off. Andrew gets the credit for noticing that our current shelves just are not right, and look flimsy alongside the sturdy chrome rails on the shelves of the pull-out pantry. We have opted to replace the current shelves with box-like shelves that resemble shallow drawers. The new shelves will require upgraded ball-bearing slides. Making both changes will add just under $200 to the cost of the cabinet, but we think it will pay off in the long run. Luckily, our cabinetmaker will have the new shelves ready to install by Friday.

Upon careful inspection, we also realized that 3 of the new cabinet doors had minor dings to the wood finish. The affected doors have been taken back to the company's shop for sanding and refinishing. The doors will also be re-installed on Friday. We love the new cabinets, and have been very impressed by the cabinet company's efforts to make sure we are completely satisfied, right from the beginning. They have truly been a pleasure to deal with. (Shameless plug here for Town & Country Cabinets of High Springs, FL)!

Today, Carlos returned to grout the bathroom, and what a fine job he is doing!
Here are some photos of the grouted subway tiles:

Closeup of the glass pencil trim, which really has depth and sparkle now that it has been grouted:

And the junction of the grouted and not-yet-grouted walls:


And, in the kitchen, big news! The porcelain farmhouse sink has at long last been removed from its box and given a place of honor! The countertop construction has begun. The plywood and Durock underlayment is now in place, almost ready for tile to be set.
Here, Andrew stands beside the new countertop base around the kitchen sink, with the sink dry-fitted in its new home:


When we got to the Cottage this evening, it was immediately apparent to me that the sink had been installed backwards!
The guys evidently failed to notice the blue trademark stamped into the porcelain:

and had it facing the window, rather than the front. Andrew and I hoisted the sink off of its stand, gave it a 180-degree turn, and slipped it back into place. However, because this sink has an offset drain, the drain-hole that has been cut out of the wooden sink base will have to be corrected, but that should be a relatively easy fix. I blame the mixup on the fact that the installers are male and, as such, completely oblivious. (In their defense, Andrew also said that he didn't know the sink had a trademark until I pointed it out, so it must be a guy thing, and only confirms my suspicions).

The sink, correctly positioned:

and resting on its sturdy wooden base:


The bare wood sink base will be completely concealed behind wood trim and some fancy millwork when all is said and done. The space beneath the sink will be kept open (without cabinet doors), and a curtain will eventually cover the under-sink opening, to complete the country kitchen look.

Saturday, September 27, 2008

Cooler days, new kitchen sink and tile, and Meyer lemons.


The end of September has brought cooler mornings, and clear blue sunny days! The Meyer lemon tree outside the kitchen door is full of fruit. I'm looking forward to our first harvest and first taste of Meyer lemonade. Meanwhile, we have decided on this lovely blue tile for the kitchen countertop and backsplash:

The focal point of the new kitchen will be the new fireclay farmhouse sink. Solid white porcelain, with an apron front. It's a beauty, and so heavy that we haven't been inclined to remove it from its nicely padded shipping box. There it will remain until it gets tiled into the new countertop beneath the kitchen window.

I can't wait to see it installed, along with the new cabinets and new tile countertop. The rough-in should be interesting, since the sink weighs about 140 pounds, empty! We found a local kitchen cabinetmaker who has drawn up a beautiful layout for us. We'll have their bid in hand next week. If we're happy with the price, it's just a matter of deciding on a wood finish and hardware, and then waiting 4-5 weeks for delivery.


There's no telling when the remodel will begin, since a lot depends on when the necessary fixtures, appliances, cabinets, and other materials arrive, because we're hoping to avoid construction delays by having everything on-site before the job starts. And that, of course, means final decisions must be made, and quickly, so that orders can be placed, and deliveries coordinated. But, each decision that's made brings our new kitchen a little closer, and it will be happening SOON!